Searching Searching







List of references -> List of references   zpětEnglishRussian


References

CZECH REPUBLIC:

RWE TRANSGAS, a.s.

  • Station No. 7057 – Replacement of SS1 service pipes
  • Station No. 7058 – Replacement of SS4 service pipes
  • Station No. 7054 – Adjustment of pipe manifolds and drying systems in SS1 and SS4, PS 05/1,2 - ŘS, M+R
  • Repair of the Hájek - Měcholupy gas pipeline

    RWE GasNet, s.r.o.
  • Reconstruction of Gas Pipeline Janov - I. phase, part A
  • Reconstruction of high-pressure gas pipeline, DN 300, Louny - Hořešovičky
  • VTL č. 173 - exchange TU 173/1 incl. Exchange of fencing and change of surface TU 155/2 a 155/3 - Poděbrady – Chvalovice

    RWE Gas Storage, a.s.
  • Const. 7503 – Installation of border valves on UGS Tvrdonice
  • Adaptation of Underground Gas Storage Tvrdonice, Phase - C"
  • Reconstruction of Underground Gas Storage Třanovice, Phase II and III

    VČP Net, s.r.o.
  • Reconstruction of high-pressuer TU DN 200 Janov incl. OÚ Polička; Reconstruction of high - pressure OU DN 200 Dlouhá - Čes. Třebová; Reconstruction of high - pressure OU DN 100 Litomyšl I
  • Reconstruction of high-pressuer 200 incl. KAO Vysoké Mýto – Choceň, locality Choceň
  • Reconstruction of high-pressuer TU Holín - Zámezí
  • Reconstruction of high-pressuer gaspipeline DN 500 Konecchlumí – Turnov, prolapse of kapake and recess
  • Reconstruction of high-pressuer TU DN 500 Stráčovská Lhota; Rekonstruction of VTL TU DN 500 Čimysl incl. OU Pohoří
  • Repair of high-pressuer plynovodu DN 200 Barchov – Semtín
  • Reconstruction of high-pressuer DN 500 Hlinsko

    SMP Net, s.r.o.
  • REKO low-pressure MS Přerov – ul. Svépomoc

    JMP Net, s.r.o.
  • Relocation of high-pressure gas Brno - Oslavany
  • Relocation high-pressure pipeline Brno – Skandinávská

    STP Net, s.r.o.
  • Reconstruction of high-pressure gas pipeline nr. 4 Phase Radimek - TU 4/15
  • Reconstruction of high-pressure gas pipeline nr. 4 Phase Radimek - TU 4/16

    SČP Net, s.r.o.
  • Nový Bor - Jiříkov, reconstruction of high-pressure gas pipeline
  • Reconstruction of TU 1080 RS Bonex Kladruby - turnkey
  • Industrial zone Poříčany SO 800 – gas pipelines

    RWE Plynoprojekt, s.r.o.
  • Medium-pressure Brandýs nad Labem – Stará Boleslav
  • Reconstruction of high-pressure gas piperine nr. 4 in Phase TU 4/17-TU 4/16 Relocation of high-pressure Kutlíře

    EOP a.s.
  • Pce, HV C 2 repair of HV phase from VŠCHT direction to kasárna, Poděbradská ul. Semtín
  • Pardubice – Trnová – replacement of caliduct VCHZ ZL II.
  • Reconstruction of secondary heat distribution F8 Pohřebačka – II. Phase

    Pražská plynárenská, a.s.
  • New medium-pressure gas pipelines and connections Řeporyje, Praha 5

    Pražská teplárenská, a.s.
  • JA 2009 TMA repair of caliduct by replacement of pipes 3. Phase ZV TG 3
  • HVP Sodomkova, Praha 15
  • HVP and PS OS Dvůr nad Rokytkou, Praha 9
  • Repair of PTV Nad Třebešínem II, Praha 10 – Strašnice

    Žatecká teplárenská, a.s.
  • TN Hošťálkovo nám. – Dvořákova, II. Phase

    Plynostav – regulace plynu, a.s.
  • Project Gazelle, Lot 1 A, Lot 1 B, border transfer station and gas pipeline DN 1400, Czech Republic – as subcontractor
  • Construction of gas pipeline DN 1400 PN 85 Hora sv. Kateřiny - Rozvadov - Phase 1B Plynovod Brandov - LVS Surovice II.
  • Increasing the compression ratio on KS 01 Velké Kapušany (Const. nr. 20815)
  • Const. nr. 7061 – Assembling works on gas pipeline –Malá Bečva, UNGS Lobodice
  • Shifting of high-pressure Gas Pipeline DN 700, PN 63 Hrušky - Kyselovice

    SYNTHOS Kralupy, a.s.
  • Measurement of gas for ČeR and SSO
  • Expansion of hydrant water - Kaučuk Kralupy

    ČEPRO, a.s.
  • Renewal of storage capacity PH and oil tanks for storage Klobouky u Brna
  • Reconstruction of the final device and distribution shaft KRYRY
  • Biofuel Včelná
  • Reconstruction of Pipeline Smyslov – Včelná – Phase II. and III
  • Repair of pipes DN 300, PN 63 Nové Město – Cerekvice
  • Repair works of defects on product pipeline DN 300 river Morava – Klobouky u Brna

    SKANSKA, a.s.
  • New medium-pressure gas pipeline Kolín - Ovčáry

    MERO, a.s.
  • Shifting of oil pipeline, product pipeline and optical cable Kolín
  • Installation of sealing gaskets on protection of oil pipeline Družba

    ŘSD ČR
  • Highway D3 Tábor - Veselí nad Lužnicí

    CHEMOPROJEKT
  • Renewal of storage capacity PH – Roudnice n/L. – Phase A

    SEVEROČESKÁ PLYNÁRENSKÁ
  • Chomutov – Smilov, reconstruction of high – pressure gas pipeline – 2. phase

    STŘEDOČESKÁ PLYNÁRENSKÁ, a.s.
  • New high - pressure Doksy - Tuchlovice (č. st. 10414)
  • Repair Oprava - Shifting of the part of Gas Pipeline nr. 13 Vidovice - Kovářovice (Constr. Nr. 10455)
  • Reconstruction of high-pressure gas pipeline DN 300 from TU 2T/530 to lom. point nr. 334 - Příbram
  • Reconstruction of high-pressure - Hostomice - I. Phase
  • Reconstruction of high-pressure - Hostomice - II. Phase
  • High-pressure gas pipeline, high-pressuer RS and medium pressure gas piperine and connections for areal of military airport and city of Chotusice
  • New medium-pressure gas pipeline Strašín - Babice incl. gas piperine and connections in city of Babice
  • Repair of low – pressure gas pipeline and reconstruction of connections Mladá Boleslav

    NET4GAS, s.r.o.
  • Connection of KS Břeclav – UGS Tvrdonice

    KRÁLOVOPOLSKÁ RIA, a.s.
  • Project New source 660 MWe in the power plant Ledvice

    ABROAD:

  • Arabian gas pipeline, Phase II., part I from gas station Aleppo to syrian-turkish border, Syrian Gas Company, Syria
  • "inlet and outlet gas pipeline“, within construction "Reconstruction of Sosnogorsk factory for processing of gas ŠKODA JS, a.s.
  • Gas pipeline Šurtan – Šerabad, The Republic of Uzbekistan, ZEROMAX LLC
  • Gas piperine Berdach – Buchara – Ural, The Republic of Uzbekistan, ZEROMAX LLC
  • Magistral pipeline Kamčatka, OAO Kamčatgasprom

    UNDER CONSTRUCTION AND PRE FINALIZING:

  • Extension of the Storage Capacity NAFTA (Gajary – báden) – TKG3, Slovakia
  • Construction of gas pipeline MOP 8,4 MPa DN 700 Rembelszczyzna – Gustorzyn, Poland
  • Construction of gas pipeline DN 700 Szczecin – Lwówek, Phase I., Poland
  • Construction of UGS Wierzchowice, phase 3,5 mld. nm3, under phase 1,2 mld. nm3, PBG S.A. Varšava, Poland (PGNiG, Poland) – as a contractor in the international consortium